Traffic alert: Hutchinson Parkway to close Saturday-Monday exits 4A-8 for bridge project

Hutchinson River Parkway

Hutchinson River Parkway

Editor’s note: This DOT alert was provided by the Village of Pelham.

The New York State Department of Transportation (NYSDOT) is advising motorists that the Hutchinson River Parkway will be closed in both directions from Exit 4A (I-95 North/New Haven) in the Village of Pelham Manor to Exit 8 (Cross County Parkway/George Washington Bridge) in the City of New Rochelle. The closure will take place from approximately 12 a.m. Saturday morning, December 11 to 5 a.m. Monday, December 13, weather permitting.

These closures are needed to facilitate the erection of steel and drainage work for the Lincoln Avenue bridge project over the Hutchinson River Parkway at Exit 6 (East Lincoln Ave/Mount Vernon/Pelham) as part of an ongoing bridge replacement and rehabilitation project in Lower Westchester.

Motorists should use the following signed detours.

  • Motorists accessing the Hutchinson River Parkway northbound will be detoured to I-95.
  • Motorists accessing the Hutchinson River Parkway southbound will be detoured to the Cross County Parkway
  • Motorists traveling east on the Cross County Parkway will be directed to continue east at Exit 9 (Hutchinson River Parkway South/Whitestone Bridge) and Exit 10 (New Rochelle Road/Eastchester)

Motorists should anticipate delays and plan accordingly.

Motorists are urged to slow down and drive responsibly in work zones. Fines are doubled for speeding in a work zone. Convictions of two or more speeding violations in a work zone could result in the suspension of an individual’s driver license.

For up-to-date travel information, call 511, visit www.511NY.org or download the free 511NY mobile app.