Village of Pelham Manor: Work continues on storm drainage system

Editor’s note: This press release and the pictures were provided by the Village of Pelham Manor. The Pelham Examiner publishes press releases in the form received as a service to the community.

Work continues on interim storm drainage mitigation measures. Pictured above, workers are enlarging the catch basin inlets to improve the capture of storm water runoff and ensure the storm drainage system is working at full capacity.

Similar improvements are schedule throughout the Village.

At the same time, work continues on the long term, comprehensive analysis of our storm drainage system. Cleaning and televising of the system is underway, surveyors are out documenting pipe locations and slopes, and preparations for the high resolution aerial mapping of the system is in progress.