Village of Pelham street paving notice for Sparks, Sixth avenues

Editor’s note: This press release was provided by the Village of Pelham.

The Village of Pelham will begin road resurfacing operations beginning Monday, September 10, 2018 and lasting for approximately (2) two days (Weather changes will affect the schedule). During this time, road surfaces will be milled, drain inlets adjusted, ADA accessible sidewalk ramps will be installed, road prepared for a new surface and striping as required.

Road work will happen on the following roads (no particular order):

  • Sparks Avenue – From Wolfs Lane to the Dead End
  • Sixth Avenue – From Lincoln Avenue to Sixth Street

During this time, residents can expect limited road closures, congestion and heavy equipment. Motorists are advised to be aware of elevated sewer and storm drains and use caution when driving over such roads, reduced speeds are strongly advised as these elevated structure may damage tires.

During the installation of new pavement, roads may be open to traffic on one lane only or closed completely for a short duration. Motorists SHALL NOT drive on newly paved surfaces unless signaled (doing such does affect longevity of the blacktop and creates future potholes).

Should there be any concerns or questions please feel free to call Village Hall at 914-738-2015.